wettaq · verb · “to carry out”
Takes a request in plain words to one tested, reviewed pull request.
An agent saying it is done is only a claim, and checking its work yourself takes as long as writing it, so this brings back a pull request that has already been checked.
Use it for any change you would hand to a developer: a feature, a fix, or a follow-up on an open pull request. You get one pull request that is tested, checked in a browser when the UI changes, and reviewed, with the decisions it took listed for you. It needs a request in plain words, a repository whose npm run verify passes, and your answers to the product questions the code cannot settle.
Agent instructions
The agent follows the instructions below, from commands/wettaq.md. Its one-line description is: Investigate and implement a request through verified pull request creation.
Full agent instructions
Take the request in $ARGUMENTS from repository-grounded discovery through a pull request ready for human product validation. The active session is the task contract; do not create or persist a planning or requirements artifact. When the request continues an existing pull request, load implement-review and follow its follow-up path instead of running prepare.
Prepare The Isolated Workspace
Before repository discovery or any feature work, run from the launch checkout:
ibni prepare --slug "<short-request-slug>"Use --prefix only when an already-known repository instruction requires a different branch prefix. prepare checks the launch checkout, sweeps merged workspaces and creates the feature branch in a dedicated locked worktree. Record its JSON result in session context, especially worktreePath, sessionId, branch, defaultBranch, baseSha, evidenceDir, port, portEnv, verifyCommand, baseline, setup and cleanup. verifyCommand is the repository's verify command: the verify its committed .mexxi.json names, or npm run verify by default. Wherever this command says "run the verify command", run ibni verify --session "<sessionId>": it runs exactly verifyCommand from the worktree root on the committed tree, writes the output to a log in evidenceDir and records the result. Run it in the background where your host supports that, wait for it to finish rather than polling, and read only its final JSON (passed, logPath, and logTail when it failed). It may first wait for one of the machine's verify slots, listed in <paths.worktreeRoot>/.ibni/slots/queue, and queuedMs then says how long. A long wait is that queue, not a hang, so never stop it for that. Never run the full verifyCommand by hand: record-evidence and publish accept only a result ibni verify recorded on exactly the tree being delivered.
From this point on, run every repository inspection, command, delegated task, edit, verification, render, review, remediation, and delivery operation against worktreePath, never the control checkout. Pass the exact sessionId to later lifecycle operations (ibni <command> --help documents each). Write transient evidence to evidenceDir. port is the first of the workspace's block of ports, and portEnv names them all (PORT, MEXXI_PORT_<n> and any variable the repository reads that config maps to the block); ibni gives them to setup and verify itself. Whenever this run starts a server by hand, export portEnv and serve the app on port through the repository's own port setting (such as PORT or the dev server's port flag), and put any further server on another port of the block, so parallel worktrees never collide. Stop those servers before ibni verify, which refuses to start while any port of the block is bound. If preparation fails, report its diagnostic and stop; do not switch branches, improvise another worktree or attempt more aggressive Git recovery.
prepare copies gitignored local env files (.env*) from the control checkout and reports them as provisionedEnv. Never invent, edit, or commit them.
If discovery reveals a hard branch-naming requirement incompatible with the branch prepare made, stop rather than renaming it outside the lifecycle tool.
prepare also installs dependencies in the worktree and reports it as setup: the setup command in .mexxi.json, or the root lockfile's own install. Do not install them by hand. When setup.ran is false, read setup.reason: install by hand only if the repository documents a setup that .mexxi.json does not yet name, and say so in the pull request. Rerun ibni setup after a commit that changes a lockfile. Do not share or link mutable dependency directories between worktrees.
Establish The Task Contract
Before changing code:
- Confirm that the verify command (
prepare'sverifyCommand) exists in the repository: for the defaultnpm run verify, averifyscript inpackage.json; otherwise the tool or target it names. If it does not, stop and report that the repository does not satisfy the implementation workflow contract (/lestiprepares it); do not add it as incidental feature work. - Load
repo-contextwhen the session lacks a reliable map of the repository, its agent docs are thin, or the change spans several areas. Skip it for a local change in a well-documented repository. - Inspect the affected feature, its closest analogues, architecture, tests or behavioural contracts, local instructions, contribution and pull-request conventions, and relevant product or UX principles. Use specialist skills when their expertise materially improves the work.
- Derive a concise active contract: goal, requirements, meaningful resolved decisions, observable behaviour and experience acceptance criteria, real constraints, and relevant edge cases. Omit categories that add no value.
- Write the request text and the contract to
request.mdandcontract.mdinevidenceDir, then runibni triage --session "<sessionId>" --request-file <request.md> --contract-file <contract.md>once. Triage is in shadow: it records Jev's view of the gates for later comparison and changes nothing. Decide every gate below exactly as written, whatever it prints, and carry on if it reportsskippedorfailed.
Repository evidence and established product principles are the first source of answers. Ask the user only about genuine unresolved product behaviour, UX intent, business rules, architectural choices with product consequences, or important edge cases that cannot be inferred, with the fewest focused questions necessary. Do not stop for approval of the contract when the request and evidence are sufficient, or ask the user to choose ordinary implementation details. Keep the contract lean: no generic repository context, framework tutorials, file lists, implementation steps, or speculative abstractions.
Unattended runs. When nobody can answer (a scheduled or non-interactive run, or a question left unanswered for the session), do not stall. Take the most reasonable reading from repository evidence and product principles, note it as an assumption, and carry on. Still stop and report for a one-way door: a destructive or irreversible data change, a security or privacy decision, a public API or schema break, or anything the pull request cannot undo. List every assumption under Decisions and assumptions in the pull request, worded so the reviewer can reverse it cheaply; a question that would have changed the design becomes a decision under Your part instead of a stall.
Preflight: Green Before Work
Before the first change, run the verify command once on the untouched worktree: at baseSha, this is the baseline run. When prepare returned baseline.reused: true, the repository's CI already passed its full verify on exactly baseSha, so ibni verify records that run as reused without running anything; cite baseline (check, commit, url) as the baseline evidence, including in the pull request's Evidence. If the baseline fails, stop and report the failure; do not begin implementation or classify failures as pre-existing. The worktree is retained for diagnosis, and cleanup protects it because no pull request was recorded.
When the change will alter existing UI, capture before-shots now, while the worktree is still at baseSha: load rendered-qa and follow its before-shots section for the affected routes. Skip this for new UI. Record the decision either way with ibni record --session "<sessionId>" --before-shots taken (or skipped).
Implementation
The contract defines intent and scope. Resolve ordinary choices from repository evidence and keep changes bounded. The orchestrator owns investigation, delegation, remediation, final verification, and delivery.
When the change adds, changes or fixes behaviour, load test-design. It decides which tests the change needs and at what level, and how to see each one fail. Use the repository's existing test infrastructure. If a criterion genuinely requires E2E and the repository has no suitable infrastructure, stop and report the gap rather than introducing a framework as incidental work.
While working, you and delegated agents run targeted checks (a focused test, typecheck, rendered check, or the repository's selective verification) directly, but never the full repository gauntlet; a selective pass is feedback, not the final gate. Where the repository uses Verifika, run vfk --changed or vfk --check <name>. Only the orchestrator runs the full gate, and only through ibni verify.
Final Verification
When implementation is settled, use the repository's intentional auto-fix mechanism if one exists. Then inspect the diff, stage only intended changes and commit them (load commit-pr-writing for the message), because ibni verify refuses a tree with uncommitted or untracked work. Then run the verify command, the authoritative final gate. A failure means the implementation is incomplete: diagnose it from the result's logTail and the log at logPath (the verifika skill covers reading it), remediate in a new commit, and run it again. Never weaken repository safeguards to pass. Any later code remediation requires another commit and another run of the verify command. ibni verify records each run itself. Record each rendered QA or reviewer pass with ibni record --session "<sessionId>" and --qa <finding-count> or --review <finding-count> --accepted <count> --reviewer same|cross (cross whenever the reviewer's model is from another family than yours, by whatever route, accepted being the findings you fixed); ibni stats reports them beside the lifecycle step timings.
Then re-read the original request and active contract, and inspect the final diff to confirm the acceptance criteria and scope are covered. This is the run's requirements re-read; later stages rely on it.
Rendered QA
For meaningful user-facing work, after final verification load rendered-qa and run a proportional pass on the affected routes and states. That one pass produces the evidence the reviewer and the pull request use. Resolve its critical, high, and medium findings before review, committing the fix, rerunning the verify command and refreshing the affected evidence when code changes. Do not commit screenshots or pixel baselines, and do not present subjective judgement as deterministic verification.
Review
Invoke code-reviewer when independent judgement materially improves confidence: substantial behavioural, architectural, integration, security, maintainability, or meaningful user-facing changes. Small mechanical changes need no review merely because the agent exists. When a review runs, load implement-review first: it owns the protocol, remediation and the review gate. Delivery enters only when the final verify command, applicable rendered QA, and that gate leave no unresolved blockers.
Delivery
- Inspect worktree status and the full diff. Everything intended is committed; never commit an unrelated or empty change.
- The last
ibni verifypassed on the current commit. If anything was committed since, run the verify command again first. - Run
ibni record-evidence --session "<sessionId>"to record that the committed tree passed the gates. It refuses withrequiresVerify: trueand anextActionwhenibni verifyhas not passed on exactly this tree: follow it. - Run
ibni publish --session "<sessionId>". It fetches the default branch, integrates it safely, and pushes only the owned feature branch without force. - If
publishreturnsrequiresEvidence: true, follow itsnextAction. WhenrequiresRevalidationis also true, the integration changed the tree and prior evidence is stale: run the verify command (ibni verify) on the integrated tree, inspect the integration diff, and refresh rendered evidence only where the upstream change could materially affect it (a review refresh followsimplement-review). Commit any remediation and verify again, then record evidence and publish again. - When rendered QA produced screenshots or GIFs, publish the ones the pull request should show as
rendered-qa's publishing section describes, and use the returned URLs. Republish on follow-up delivery so the media stays current. If media cannot be published, deliver anyway and say why in Evidence. - Use
commit-pr-writingfor the pull-request title and description, whose first screen gives the merge call, the reviewer's part and the evidence. For initial delivery, create the pull request againstdefaultBranchwith the forge's CLI (gh pr createon GitHub,glab mr createon GitLab); theforgefield ofprepareoribni infonames it. Whenforgeis null, stop and report itsforgeReasonrather than guess. For follow-up delivery, update the existing pull request instead of creating another. A change toverify,setuporciCheckin.mexxi.jsonchanges the gate itself: call it out in the description's merge call. - Run
ibni mark-pr --session "<sessionId>" --url "<pr-url>". - When rendered QA ended with Could become executable checks, write them one per line to a file in
evidenceDirand runibni file-qa-checks --session "<sessionId>" --from "<file>". It files each as aqa-checkissue in the repository, skipping titles already filed. Mention the created issues in your report; if it fails (for example the forge's CLI is unauthenticated), report that and carry on, since the pull request is already delivered.
If any delivery stage fails, preserve the worktree and any commit, and report the failed stage with the tool's diagnostic. Do not bypass permissions, guess through ambiguous ownership or conflicts, rewrite shared history, force push, stash, discard work, include unrelated changes, or improvise destructive recovery. The guard hook is a backup for some of these, not their owner: what it allows is not thereby permitted.
Completion
The run succeeds when the pull request is ready for human product validation and a merge decision. Report briefly:
- the pull-request link;
worktreePathandbranch;- unresolved low findings worth knowing during product review;
- the
preparecleanup summary: removed workspaces, and kept ones with reasons.
Do not merge. Keep the worktree for follow-up changes, in this session or in a later one through adopt.
Old name: /implement, which still works for one release.